Monday, October 14, 2013
The Ox was in the ditch Sunday so we had to work. A shipping container that had been held in port for months was finally released. It was full of much needed supplies, building materials and
household items for the newest family of 4 on the team . They arrived 2 months ago. The container should have arrived before them. This was a 80 kva generator (3500lbs) that had to come off first. All we had was a tractor , lots of ingenuity and time. Prayed before we started for safety. So much could have gone very wrong.
Subscribe to:
Posts (Atom)